Emergency breakdown? 24/7 emergency breakdown response for contract clients

0467 083 336
Cairns City

CBD office plant replacement

Staged replacement of end-of-life packaged units serving a multi-tenancy office floor plate.

CBD office plant replacement

Project overview

Cool Mech's work at CBD office plant replacement

Staged replacement of end-of-life packaged units serving a multi-tenancy office floor plate.

The operating challenge

Twenty-year-old rooftop plant was failing repeatedly through the wet season, with tenants complaining of humidity and no possibility of shutting the floor down during business hours.

How Cool Mech is delivering the work

We staged the changeover unit by unit over three weekends, reusing serviceable ductwork, upgrading condensate drainage and adding zone control so perimeter offices stopped over-cooling the core.

Service outcomes

What the engagement provides

  • Zero business-hours downtime during the changeover
  • Measurable reduction in after-hours breakdown call-outs
  • Tenant humidity complaints resolved

Related services

How we can help with a similar site

Have a site with similar requirements?

Tell Kody about the property, equipment and timing. He will help you work out the practical next step.