The operating challenge
A single system served both patient areas and temperature-sensitive storage, meaning any fault put stock at risk and left the practice unable to consult.
Emergency breakdown? 24/7 emergency breakdown response for contract clients
0467 083 336New ducted system for consult rooms plus dedicated cooling for a vaccine and pathology store.

Project overview
New ducted system for consult rooms plus dedicated cooling for a vaccine and pathology store.
A single system served both patient areas and temperature-sensitive storage, meaning any fault put stock at risk and left the practice unable to consult.
We separated the loads, installed a dedicated redundant unit for the storage room with temperature alarming, and rebalanced supply air across consult rooms and waiting areas.
Service outcomes
Related services
Tell Kody about the property, equipment and timing. He will help you work out the practical next step.